Aluminium Smelter Project Alouette 2

Client

Aluminerie Alouette
Quebec, Canada

ProjectAlouette 2

CapacityPotline 2: 312 pots

TechnologyPechiney AP30
330 kA / 1320 V

ConsultantSNC Lavalin, Hatch

Scope of ABBDesign, manufacture, delivery to site, erection, testing, commissioning and completion of:
- ABB Calor Emag switchgear 145 kV GIS
- Harmonic filter
- 5 x 89 kA diode rectifier unit
- Master and local control system
- Plant control system
- DC current and voltage metering system
- DC collector busbar system
- LV distribution system
- DC voltage distribution system
- Cables, installation material

Award of ContractDecember 2002

Start of Operation2005