Aluminium Smelter Project Eagle

Client

Dubai Aluminium Ltd.,
Dubai, United Arab Emirates (U.A.E.)

ProjectPotline Number 5, Boosters

Capacity5 pots
260 kA

TechnologyDubal, United Arab Emirates

ConsultantK Home Engineering Ltd., England

Scope of ABB3 Boosters on turn-key basis incl.
- 3 Thyristor rectifiers à 30 kA, 60 VDC
- Control system
- DC metering system
- DC collector busbar system
- Cables, installation material

Award of ContractAugust 1996

Start of OperationJuly 1997


Last edited 2003-11-27
  • Rate this page
      Cancel
  • E-mail this page
      Cancel
Aluminium Smelter Project Eagle
seitp161 17123a98129d0351c1256c72003707a0