Iron Ore Handling Plant Bikiot

Client

National Iranian Steel Company, Iran
Project

BIKIOT
Capacity

2.5 Million t/y of iron ore
Background

The iron ore terminal is located at the Bandar Imam port and consists of an ore handling facility, ship unloader terminal and train loading station.

Scope of ABB

Engineering, manufacture, delivery to site, erection supervision, testing and commissioning of:
- 33 and 6.3kV switchgear
- LV Distribution and MCC’s
- Transformers
- Power Factor Correction
- MV and LV Motors and Drives
- Process Control System
- Instrumentation
- Infrastructure installation (cabling, lighting, etc)
- Complete electrical and control system for the ship unloader

Award of contract

2001
Start of Operation

2004

Last edited 2005-11-25