Aluminium Smelter Project Nordural Potline 2

Client

Nordural hf, Reykjavik, Iceland

ProjectPotline 2

CapacityPotline 2: 180 pots, 4th phase 120 pots
195 kA = 90,000 t/y (increased to 180,000 t/y in 3rd phase)

TechnologyVereinigte Aluminiumwerke, Germany

ConsultantHRV Engineering, Iceland

Scope of ABB- 245 kV switchyard

- 6.6 kV switchgears, 380 V distribution

- Distribution transformers

- 4 220 kV regulation Tr with switchsync

- 4 rectiformers 15000VDC 65kA, Thyristor

- Local control and master control system

- Micro SCADA system

- Power factor correction and harmonic filter equipment

- Complete cabling and installation system

- Erection and commissioning



Award of ContractOctober 2004

Start of OperationFebruary 2006