Pelletizing Plant "LKAB Svappavaara"

Client

LKAB, Sweden
ProjectSvappavaara Revamp

Capacity2.5 Million t/y of iron ore pellets

BackgroundBuilt in the 1960's, the pellet plants was in need of modernization. The cost of maintaining the old technology was high and LKAB wanted a higher availability. The new equipment will be installed and commissioned in six phases over a period of 3 years during the plant's biannual 14 day maintenance stops.
Scope of ABBEngineering, manufacture, delivery to site, installation, testing and commissioning of:
Complete electrical package including INSUM and AC Converters
Eight OperateIT Process Portal Stations
17 Control IT AC800 Constrollers for 9000 I/O's
Award of contract2003

Start of OperationOngoing from 2003 to 2006


Last edited 2004-09-22