Aluminium Smelter Project
Emal PL1 and 2

Client

Emal Aluminium Co. L.L.C Abu Dhabi

ProjectPotline Number 1+2

EngineerSNC Lavalin

TechnologyDubal

Consultant-

Scope of ABB245 kV gas insulated switchgear (GIS)
  • 400VAC distribution
  • SCADA with IEC 61850
  • control and protection with IEC
    61850
  • installation
  • high voltage test
  • commissioning
  • turn-key

Award of ContractJuly 2007

Start of OperationJune 2009


Last edited 2008-01-07
  • Rate this page
      Cancel
  • E-mail this page
      Cancel
seitp161 536d373c9c6b956ec12573c600430270