Products & Services

Aluminium Smelter Project Sunndal

Client

Hydro Aluminium a.s
Sunndalsora, Norway

ProjectSunndal SU 4

CapacityPotline 4: 316 pots

TechnologyNorsk Hydro
250 kA / 1500 V

ConsultantNone

Scope of ABBDesign, manufacture, delivery to site, erection, testing, commissioning and completion of:
- Harmonic filter bank, connected to tertiary winding of each rectifier transformer
- 5 x 69 kA diode rectifier unit
- Master and local control system
- Plant control system
- DC current and voltage metering system
- DC collector busbar system
- LV distribution system
- DC voltage distribution system
- Cables, installation material

Award of ContractApril 2001

Start of OperationOctober 2002


Last edited 2003-11-27
  • Rate this page
     
  • E-mail this page
     
Aluminium Smelter Project Sunndal