Aluminium Smelter Project Kestrel

Client

Dubai Aluminium Ltd.
Dubai, United Arab Emirates (U.A.E.)

ProjectPotline Number 7 - 9
Potline Number 4 Upgrade of Rectiformer Controls


TechnologyDubal, United Arab Emirates

ConsultantMott MacDonald / SNC Lavalin

Scope of ABBDesign, manufacture, delivery to site, erection, testing, commissioning and completion of:
Ten 63 kA / 1240 V rectifier-transformer units
- Local control system
- Master control system
- Micro scada system
- DC metering system
- DC collector busbar system/transfer busbar
- Cables, installation material

Award of ContractJune 2002

Start of OperationAugust 2003 - June 2005


Last edited 2005-09-30