Aluminium Smelter Project Nalco

Client

National Aluminium Co. Ltd. (NALCO) Bhubanswar, India

ProjectPotline 3

CapacityPotline 3: 240 pots

TechnologyPechiney AP18
185kA / 1150 V

ConsultantEIL

Scope of ABBDesign, manufacture, delivery to site, erection, testing, commissioning and completion of:
- AIS switchgear 220 kV
- 4 x 66 kA diode rectifier unit
- Master and local control system
- Plant control system
- DC current and voltage metering system
- DC collector busbar system design
- LV distribution system
- DC voltage distribution system
- Cables, installation material
- Redundant control system

Award of ContractOctober 1999

Start of OperationAugust 2002


Last edited 2003-11-27