Aluminium Smelter Project Boosters PL3

Client

Dubai Aluminium Company Ltd.
Dubai, United Arab Emirates (U.A.E.)

ProjectPotline Number 3, Boosters Rectifiers

CapacityPotline 3: 118 pots, 230 kA + 50 pots, 260 kA

TechnologyDubal, United Arab Emirates

ConsultantMott MacDonald

Scope of ABBDesign, manufacture, delivery to site, erection, testing, commissioning and completion of:
- 2 Booster rectifier-transformer units, 15 kA, 200 VDC
- Local control system
- Master control system
- DC current and voltage metering system
- DC collector busbar system/transfer busbar
- LV distribution system
- DC voltage distribution system
- Cables, installation material

Award of ContractNovember 2002

Start of OperationJanuary 2004


Last edited 2003-11-27
  • Rate this page
      Cancel
  • E-mail this page
      Cancel
seitp161 96fdb8830c91817fc1256ca90029f458