Qassim Line 1 - Upgrade Cement Plant Project

Client

Qassim Cement Co. / Kingdom of Saudi Arabia

ProjectQassim Cement production Line 1, upgrade of the Production Line #1

Capacity4000 t/d

BackgroundIn the event of the expansion and upgrade of the existing plant
Line #1 the Power supply was changed form existing Diesel Power Station to the public network via a new HV/MV Switchgear 60 Hz and Static Frequency Converter 50 Hz . At the same time the control system was changed to Industrial IT

Consultant-

Mechanical Supplier-

Scope of SupplyDesign, manufacture, delivery, erection, testing and commissioning of:

New main substation (including civil construction)

Power distribution HV/MV and LV
Static frequency converter 50 Hz
Power factor compensation
Power & distribution transformers
Emergency power generation
Motors & drives
Process control system (Industrial IT)
Infrastructure equipment

Award of ContractAugust 2003

Start of OperationApril 2005


Last edited 2005-03-21