Aluminium Smelter Project Eagle Boosters PL5

Client

Dubai Aluminium Company Ltd.
Dubai, United Arab Emirates (U.A.E.)

ProjectPotline Number 5,
Boosters Rectifiers

TechnologyDubal, United Arab Emirates

ConsultantMott MacDonald

Scope of ABBDesign, manufacture, delivery to site, erection, testing, commissioning and completion of:
- 2 Booster rectifier-transformer units, 30 kA, 60 VDC
- Local control system
- Master control system
- DC current and voltage metering system
- DC collector busbar system / transfer busbar
- LV distribution system
- DC voltage distribution system
- Cables, installation material

Award of ContractFebruary 2003

Start of OperationSeptember 2004


Last edited 2003-11-27
  • Rate this page
      Cancel
  • E-mail this page
      Cancel
seitp161 ddd5262c7588b317c1256cda002aaaec