Aluminium Smelter Project Alba PL4

Client

Bahrain Aluminium B.S.C. (C), Bahrain

Project

Extension Potline Number 4

Capacity


288 pots
300 kA

Technology

Pechiney, France

Consultant

Bechtel Corporation, U.S.A.

Scope of ABB








- Complete rectifier plant on turn-key basis with 6 x 63 kA, 1300 V rectifier units, including control system and DC collector busbar.

- Complete auxiliary substation on a turn-key basis including 2 x 35 MVA transformers, power factor capacitors, earthing resistors and 380 / 220 V distribution center.

- Modification and extension of the existing 33 kV switchgears including metering and control equipment.

Award of Contract

July 1990

Start of Operation

July 1992