Pelletizing Plants CVRD Vitoria

Client

Companhia Vale do Rio Doce (CVRD),
Vitoria, Brazil

Project

VITORIA PELLET REVAMP
Capacity

26 Million t/y of pellets
Background

The CVRD Pelletizing Complex in Vitoria consists of seven plants, of various age, with a total annual production of 26 million t/y of iron ore pellets. Two of the plants are owned solely by CVRD, and the others were established as joint ventures with Spanish, Italian, Japanese and Korean companies. The order is for the replacement of the existing process control systems for each plant.

Technology

Lurgi Process
Scope of ABB

Engineering, manufacture, delivery to site, installation, testing and commissioning for each of the 7 production lines, without loss of production, of:
- Process Control System
- Interface to 15-20 sub-systems
- UPS
- Cable and installation material

Award of contract

2000
Start of Operation

Ongoing from 2001 to 2004

Last edited 2003-10-23