The number of large-scale wind-power parks has increased dramatically in recent years.
Since the sites are often located offshore or in remote rural or mountainous areas, the electrical system connecting them to the grid is an important part of the investment.
In offshore windparks it can determine the viability of a project.
ABB offers tailor-made solutions for interconnecting windmills and connecting windfarms to the national grid system.
ABB is a competent partner for overall electrical system studies and optimized system design.
We also secure our deliveries to be in line with the interconnecting utility's regulations and requirements connecting.