But, there may be larger reasons for selecting HVDC than pure investment costs!
A HVDC transmission line costs less than an AC line for the same transmission capacity. However, the terminal stations are more expensive in the HVDC case due to the fact that they must perform the conversion from AC to DC and vice versa. But above a certain distance, the so called "break-even distance", the HVDC alternative will always give the lowest cost.

Typical investment costs for an overhead line transmission with AC and HVDC.
The break-even-distance is much smaller for submarine cables (typically about 50 km) than for an overhead line transmission. The distance depends on several factors (both for lines and cables) and an analysis must be made for each individual case.
The importance of the break-even-distance concept should not be over-stressed, since several other factors, such as controllability, are important in the selection between AC or HVDC.