Migration and Upgrades

ABB has upgraded exiting HVDC stations to achieve higher efficiencies and better performance.

In order to upgrade older plants ABB can adapt modern systems/equipment to be built into existing plants. There are many reasons fo carrying out technical modernization, such as:

  • Reduces maintenance
  • Better availability
  • Greater reliability
  • Increased power
  • Reduced losses
  • Extended operational life time
  • A new generation of technical support
For example, we can replace old relay-based or analogue control equipment with modern digital equipment.

Ongoing upgrade orders:
Chateuguay back-to-back upgrade
Blackwater valve cooling and control upgrade

Recently completed upgrade orders:
Cahora Bassa, Apollo
Skagerrak control upgrade
Sylmar Replacement Project
MACH 2 control system for CU and Square Butte HVDC projects

Documentation and downloads

There are no downloads in current category.
  • Rate this page
      Cancel
  • E-mail this page
      Cancel

Your preferences:

db0003db004333 6cca8e13cc496e97c125751200315e32